top of page

You Can Evaluate The Cost Required to be
Incurred on The Construction of Your House.

STEPS

  1. Find Out The Plot Area In Sq Ft on        The Calculator

  2. Check The Ground Coverage From        The Table For Your Plot

  3. Multiply Ground Coverage % With        Plot Area in Sq Ft

  4. Multiply The Outcome Of Above            Step With The Floors You Want to          Build

  5. Multiply The Outcome of

      Above Step with the per Sq Ft

      Construction Cost You Wish

      to Take From Us

Area Coverage

Plot Size                  G.F Coverage

150                           945  Sq.Ft. *

200                          1260  Sq.Ft. *

250                          1575  Sq.Ft. *

300                          1890  Sq.Ft *

400                          2520  Sq.Ft *

500                          3150  Sq.Ft *

This Will Give You An Estimate Of The Construction Cost Required. However The Actual Cost May Vary As Per The Drawing Or The Actual Area. Planned To Be Built

A 250 Sq Yd Plot Will Have(250*9)=2250open paren 250 * 9 close paren equals 2250(250*9)=2250Sq.Ft Area.

Allowed Ground Coverage For 250 Sq Yd Plot = 70%.Covered Area For Ground Floor =2250X70%=15752250cap X 70 %

equals 1575

2250𝑋70%=1575

Sq.Ft.
Assuming You Want To Build 3 Floors

(1575*3)=4725open paren 1575 * 3 close paren equals 4725

(1575*3)=4725

Sq.Ft.
Cost Of Construction =

4725*1600/4725 * 1600 /

4725*1600/

Sq Ft

=75.60equals 75.60

=75.60

Lacs.

ChatGPT Image Nov 5, 2025, 08_01_35 AM.png

Contact Us For Building Your Home

bottom of page