You Can Evaluate The Cost Required to be
Incurred on The Construction of Your House.
STEPS
1. Find Out The Plot Area In Sq Ft on The Calculator
2. Check The Ground Coverage From The Table For Your Plot
3. Multiply Ground Coverage % With Plot Area in Sq Ft
4. Multiply The Outcome Of Above Step With The Floors You Want to Build
5. Multiply The Outcome of
Above Step with the per Sq Ft
Construction Cost You Wish
to Take From Us
Area Coverage
Plot Size G.F Coverage
150 945 Sq.Ft. *
200 1260 Sq.Ft. *
250 1575 Sq.Ft. *
300 1890 Sq.Ft *
400 2520 Sq.Ft *
500 3150 Sq.Ft *
This Will Give You An Estimate Of The Construction Cost Required. However The Actual Cost May Vary As Per The Drawing Or The Actual Area. Planned To Be Built
A 250 Sq Yd Plot Will Have(250*9)=2250open paren 250 * 9 close paren equals 2250(250*9)=2250Sq.Ft Area.
Allowed Ground Coverage For 250 Sq Yd Plot = 70%.Covered Area For Ground Floor =2250X70%=15752250cap X 70 %
equals 1575
2250𝑋70%=1575
Sq.Ft.
Assuming You Want To Build 3 Floors
(1575*3)=4725open paren 1575 * 3 close paren equals 4725
(1575*3)=4725
Sq.Ft.
Cost Of Construction =
4725*1600/4725 * 1600 /
4725*1600/
Sq Ft
=75.60equals 75.60
=75.60
Lacs.